AMR safety planning starts with the operating environment
An autonomous mobile robot operates as part of a wider system: the vehicle, route, people, loads, pickup and delivery stations, charging area, connected equipment and operating procedures. A safety scanner or warning light alone does not make the complete workflow safe.
The operating environment, intended use and reasonably foreseeable interactions need to be assessed for the selected vehicle and application.
1. Define the intended operating zone and workflow
Begin with a clear description of what the AMR is expected to do:
- The approved load, pallet, carrier and maximum operating condition
- Pickup, travel, waiting, delivery and charging locations
- Normal route, turns, crossings, doorways, slopes and restricted areas
- Expected shifts, traffic levels and operating hours
- Manual forklifts, pallet trucks, pedestrians and other equipment sharing the area
- Normal, degraded, maintenance and recovery activities
- Interfaces with doors, conveyors, machines, lifts or software systems
Assess the real operating environment, including busy periods and temporary obstructions—not only a quiet demonstration route.
2. Identify who may enter or interact with the route
Consider trained operators and supervisors as well as contractors, visitors, cleaners, maintenance personnel and people who do not normally work in the area.
- Where can people enter or cross the route?
- Are there blind corners, doorways, racks or machines that limit visibility?
- Can someone become trapped between the AMR, its load and a fixed structure?
- Could a person approach the vehicle from the side or rear?
- Are manual vehicles likely to overtake, reverse across or block the route?
- How will visitors and temporary workers understand the operating rules?
The design should account for predictable human behaviour rather than assuming everyone will always keep clear.
3. Complete a project-specific hazard and risk assessment
Malaysia's Department of Occupational Safety and Health publishes guidance on Hazard Identification, Risk Assessment and Risk Control (HIRARC). The assessment should cover the complete intended workflow and determine suitable controls for the facility.
- Collision with a person, manual vehicle, rack or equipment
- Crushing or trapping against fixed structures
- Unstable, damaged, misaligned or unsuitable pallets and loads
- Load displacement or collapse during pickup, travel or transfer
- Unexpected movement during docking, recovery or maintenance
- Poor floor condition, contamination, thresholds, slopes or insufficient clearance
- Blocked protective devices, reduced visibility or unsuitable environmental conditions
- Loss of communication, interface failure or unavailable destination
- Access to charging, maintenance or restricted operating areas
- Unauthorised manual operation or intervention
A generic checklist cannot determine the correct protective measures or residual risk for every facility.
4. Design safeguarding as a layered system
Depending on the verified assessment and selected equipment, controls may combine route planning and physical separation, controlled crossings, guards or barriers, defined stations, project-specific behaviour zones, safety-rated functions, suitable warnings, maintained markings, traffic rules and safe fallback behaviour.
Exact detection fields, stopping behaviour, clearances and speed limits must come from the selected system's verified design, site conditions and commissioning process. They should not be copied from another facility or a generic web article.
5. Review loads and transfer points carefully
For pallet jack and reach truck AMRs, the load-handling interface can introduce risks beyond vehicle travel. Confirm:
- Pallet or carrier type, condition, dimensions and fork-entry direction
- Load weight, centre of gravity, stability and securing method
- Pickup and delivery height and alignment requirements
- Rack, stand, conveyor or machine interface condition
- Clearance around forks, outriggers, mast, load and surrounding structures
- Detection of missing, damaged, obstructed or incorrectly positioned loads
- Behaviour when a transfer cannot be completed as intended
- Prevention of premature movement before a transfer is safely complete
Rated payload alone does not establish whether a particular load and interface are suitable.
6. Plan crossings, doors and connected equipment
Where the AMR interacts with an automatic door, shutter, conveyor, machine, lift or call station, define the sequence, confirmation signals, failure states and responsibility for each interface.
The project should establish what happens when a door does not confirm its position, a destination is occupied, communication is interrupted, a person enters the transfer area, or equipment is stopped or reset. Integration feasibility does not itself confirm safe operation.
7. Control charging, maintenance and recovery work
Charging and intervention areas should be considered part of the operating system. Review access, environmental needs where applicable, electrical and fire-safety requirements, isolation procedures, housekeeping and the space required for authorised work.
Only trained and authorised personnel should perform defined manual, maintenance or recovery activities.
8. Validate normal and foreseeable exception conditions
Commissioning or pilot tests should confirm the agreed workflow and approved exception scenarios. Depending on the project, this may include controlled tests for route obstruction, occupied crossings, unavailable destinations, low-battery behaviour, interrupted tasks, load exceptions and authorised recovery.
Tests must follow the selected supplier's procedures and project safety controls. Do not create unsafe scenarios merely to demonstrate obstacle detection.
9. Define training and operating ownership
Before handover, identify who is authorised to operate, supervise, maintain, recover and change the system. Training and local procedures may need to address normal operation, daily checks, route rules, alarms, blocked routes, emergency stopping, manual modes, charging, fault reporting and change control.
10. Questions to answer before an AMR pilot
- Is the intended workflow, load and operating area clearly defined?
- Has the facility assessed interactions with people and manual vehicles?
- Are trapping, crossing and transfer-point hazards understood?
- Are pallets, loads and pickup/delivery interfaces suitable for assessment?
- Are safeguarding, traffic controls and warning methods defined?
- Are connected-equipment failure states and fallback procedures documented?
- Are charging, maintenance and recovery responsibilities assigned?
- Are training, testing, acceptance and change-control requirements agreed?
Reference framework
Malaysia DOSH HIRARC guidance →
ISO 3691-4:2023 overview →
The applicability and current edition of any law, standard or guidance must be confirmed for the selected project.